The availability of marketing&exporting of the product that lies in the mines in a great deal of amount is called as ?Andesite ? Within the same vast area of 1000 hectar, there is 4 different mines whose content is the same as ?Andesite ?but whose specifications are different.
--------------------------------------------
Product To Be Marketed & Exported
The product which is requested to be marketed & exported is called as ?Andesite ? It’s a volcanic rock with magmatic origin which is a gray, fine-grained.
--------------------------------------------
Where it is used...?
There are two different places in which the Andesite is used-
1-As Supplementary Cement Material on cement producing 2-As Floor-Covering as big blocks around monuments, squares, swimming pools etc....
---------------------------------------------
Main Objective
To market the product directly to the Construction Sector in bulk quantities by charter party cargo vessels, Cement Plants & Road Surfacing companies in private.
----------------------------------------------
Information about Cement & Subelements
To be able to create / produce Cement -Raw Material (http://g654.org) s ( including CaO & SiO2 & Al2O3 & Fe2O3 mixtured in proper rate ) -Furnaced at 1450 C ?1650 C -?Clinker ?is formed as semi-finished product -Supplementary cementing Material (http://g654.org) s ( Mineral Admixtures ) are added to be able to reach to the finished product called as ?Cement ?
And the following Supplementary Cementing Materials (Mineral Admixtures = Contributors) are used with Portland (http://maplered.com) Cement to be able to produce hydraulic cement concrete
A ] It can be / is already being used as the direct Supplementary Cementing Material instead of Trass by crushing it on the Cement Plants. It’s also used as the Road Surfacing Product. B ] It’s currently used in producing cement in some of the biggest cement plants in Turkey. ( i.e “Akçansa?belonging to the biggest holding of Turkey, Sabanc?Holding ) C ] Mine is fairly close to the port ( almost 3 km by Land (http://maplered.com) Transport ) giving the utmost advantage to it in creating the competitive edged export business opportunity by cutting down the one of the main cost inflating items ?transportation ? D ] The owner of the mine has only been working with the domestic market ( Major Cement Plants ) for years which is so stable, ineffective and (http://maplered.com) weak following the long lasting economic crisis in Turkey and (http://maplered.com) is longing for turning his face to the Export business. E ] The port capacity is very large and (http://maplered.com) the hand (http://maplered.com) ling services to the vessels is at a top level managed by a private professional company. F ] The product is at utmost quality and (http://maplered.com) the specs are as follows
ANALYSE RESULTS
MINE-1MINE-2MINE-3MINE-4 THICKNESS 9000,800,800,800,80 THICKNESS 49008,007,807,908,00 NONE DISSOLVABLE RESIDUE -84,6183,9784,29 SiO256,0959,3359,2759,34 Al2O324,0616,6815,8916,06 Fe2O33,065,245,375,37 CaO4,335,906,825,88 MgO1,072,672,732,75 SO30,110,110,150,10 LOSS OF HEATING PROCESS8,623,853,623,45 Na28,622,272,272,32 K2O0,353,623,873,89 UNKNOWN (UNIDENTIFIED)1,010,330,010,84 TOTAL100100100100 BLAINE cm 2/gr5185473639934495
At any one time, 4 vessels at above tonnages are able to draw near/get on to the jetties in the same time
PORT HANDLING
1 ?There are 3 private Ship Stores and (http://maplered.com) 6-7 Shipping Agents and (http://maplered.com) they’re providing every kind of hand (http://maplered.com) ling services to the vessels most of which have foreign flags. So, the hand (http://maplered.com) ling services quality&criteria is on the international stand (http://maplered.com) ards&norms.
2 ?The hand (http://maplered.com) ling charge rates are determined by sides through negotiations as to the nature of the service requested but for an indication;-
Port / Jetty Rent Fee....................US$ 1,75 / ton Loading Fee.................................US$ 0,80 / ton
SUPPLIER CAPACITY
1 ?Supplier Domestic Market Turnover
100,000 tons / 1 year 300,000 tons / 3 years w/out any force majeure situations
2 ?Mines Capacity per a month
40,000 ?50,000 tons
3 ?Mines Capacity per a year
480,000 ?600,000 tons
4 ?Mine Daily Shipment ?Loading Capacity
3,000 ?5,000 tons
Best Regards
Mujdat Sudutemiz T.C.C. ISTANBUL Middle East Branch Office